Saturday 18 November 2017

FYP presentation day

WEEK 15:

 Final year project poster:





INDUSTRIAL DAY:



Alhamdulillah, thanks to allah s.w.t to give me chance to feel how to be a final year candidate and can continue my responsibility as a student. And also thanks to my FYP supervisor Madam Norhayati because always support and give all idea to make sure their student project will be more successful. During industrial day my also function as well and didn't have any problem and lastly thanks to all my friend who are give a full commitment to help my project to give and idea because this project is the last minute project. Without idea and information from my supervisor and friend in this project, maybe not be success. Thank You.      

Saturday 11 November 2017

Prototype of the project

This is the last week to prepare all the project and to make sure all the system will be function as well.

                                   1] This part is to do wire ring all the bulb at home prototype.




2] All the system are completely construct and this project im also added the GSM to make this system is more modern.




 3] The project is already complete and system is function as well.


Friday 3 November 2017

explain more about this new project

 On this project i will be used a Arduino UNO to control the whole system when someone is the piezo sensor it will be send signal to the Arduino UNO and the Arduino will be react to the other component to make this system is more secure.






After the Arduino detect the buzzer and all lamp or bulb will be automatically on around the house.
On this project also using a voltage regulator to maintain the voltage output connect with arduino.









Im already contruct and test the voltage regulator to get the maintain output to connect to the arduino. the voltage is 5V. And relay also used in this project, the relay type i used is relay 12V 4-channel. The relay already has been tested to connect to all the lamp or bulb. The connection bulb/lamp are in parallel.


FYP presentation day

WEEK 15:  Final year project poster: INDUSTRIAL DAY: Alhamdulillah, thanks to allah s.w.t to give me chance to fee...